Today's edition Edition Today
← Home
Home · Costa Cantábrica

Vigo presents project for new tribune stand at Balaídos stadium

The mayor of Vigo and municipal technicians unveiled the technical documentation for the transformation of the tribune stand, unanimously approved by the monitoring committee of the agreement between the city council and Real Club Celta. The project involves a total investment of €86 million.

Vigo presents project for new tribune stand at Balaídos stadium

The mayor of Vigo, Abel Caballero, along with municipal technicians, presented the technical documentation for the transformation of the tribune stand at Balaídos stadium, following its unanimous approval by the monitoring committee of the agreement between the Concello de Vigo and Real Club Celta on 24 November.

Caballero highlighted that the project aims to increase the stadium's capacity to 43,118 spectators and meets FIFA requirements for hosting matches in the 2030 World Cup. The mayor reiterated that Vigo remains a candidate city for the tournament, alongside other evaluated venues, with FIFA conducting inspections of the candidate stadiums, including Balaídos.

Details of the new tribune stand

The transformation will involve the construction of two wings extending over the Marcador and Gol stands, alongside a comprehensive renovation of the interior facilities. This includes a designated access for team buses, parking spaces, independent changing rooms, a press room, mixed zones, and new hospitality areas. A lift will also be installed to connect the changing rooms and parking with the VIP area.

One of the standout features will be the new roof over the tribune, covering 9,000 square metres and supported by a large beam weighing approximately 600 tonnes, without intermediate supports, resting on two access towers.

Investment and timeline

The budget for the new tribune stand is set at €78.3 million, with the total investment for the project reaching €86 million. Construction is scheduled to commence in the last quarter of 2027, with completion expected by the end of 2029. As a preliminary measure, the Concello has been relocating major service collectors around the stand since June 2026, with an investment of nearly €3 million and a 14-month execution period.

During the 26 months of construction, the lower stand will remain in use, with an elevated and protected structure installed for television cameras and lighting.

Mobility and fan zones

The presentation also included findings from a mobility study conducted for the 2030 World Cup, indicating that over 128,000 residents of Vigo can walk to Balaídos. The planning includes three fan zones located in Castrelos, Navia, and Porta do Sol, as well as park-and-ride facilities with shuttle services at the Technological and Logistics Park, Samil, and IFEVI.

Ratings and comments

No ratings yet.